Structure and Work Packages

 

AP1 – Project Management

Coordination and follow-up of all project work packages.Public relations as well as presentation and communication to external interest groups, like enterprises, associations, administrations, working groups, and so on.

AP2 – Analysis, Concepts and Specifications

Investigations on market- and technology potentials of future C-PMSE products. Analysis, concept and specification of the system and its components, as well as definition of the internal and external interfaces.

AP3 – Standardization and Regulation

Contributions and documents for different working groups at ITU, ETSI, CEPT and Bundesnetzagentur, as well as active participation in meetings of this organizations. Holding workshops of Associated Board.

AP4 – Coexistence

Investigations on coexistence of C-PMSE with other radio services. Acquisition and modeling of the transmission characteristics of the reference scenario as well as modeling of the interferences of the test equipment. Simulation of coexistence scenarios by integration of the interference characteristics of the test equipment.

AP5 – Radio Resource Management

Investigations on methods to evaluate and administrate the available frequency bands, cognitive Methods for the local radio resource management as well as adaptation of the audio transmission links. Development of the „Cognitive Engine“ as smart control unit and the „Frequency coordinators“ for administration of the frequency bands, which are communicating with a simulated database.

AP6 – Information Acquisition

Design of the scanning receiver network for real-time acquisition of the targeted frequency bands. Investigation of methods to predict available frequency bands by considering interferences.

AP7 – Research Platform

System test inside the lab. Setup of all components necessary for the research platform as well as system integration and test of the platform. Demonstration of a sample C-PMSE system using the research platform environment.

News